Petition of PPA between the Solairepro Urja Private Limited and the NTPC Limited seeking relief on account of Change in Law event – EQ Mag

Petition of PPA between the Solairepro Urja Private Limited and the NTPC Limited seeking relief on account of Change in Law event. For more information please see below link:

Petition seeking appropriate action by the Commission under Sections 142 and 146 read with Section 149 of the Electricity Act, 2003 for non-compliance of Ombudsman’s Order and violation of the Regulation – EQ Mag Pro

NTPC Limited Issue Tender for POWER EVACUATION PACKAGE-I UNDER DEVELOPMENT OF 755 MW GVREL SOLAR PARK AT TILAIYA AND PANCHET RESERVOIR – EQ Mag

NTPC Limited Issue Tender for POWER EVACUATION PACKAGE-I UNDER DEVELOPMENT OF 755 MW GVREL SOLAR PARK AT TILAIYA AND PANCHET RESERVOIR . For more information please see below link:

TSREDCO issue Design, Supply, Installation, Testing and Commissioning of aggregated capacity of 1140KW (485KW + 355KW + 300KW) Grid Connected Rooftop Solar PV power plants at various Govt. Buildings in all over Telangana State. – EQ Mag Pro

NTPC Limited Issue Tender for Annual Maintenance contract for 1.1648 MW Roof top solar system – EQ Mag

NTPC Limited Issue Tender for Annual Maintenance contract for 1.1648 MW Roof top solar system. For more information please see below link:

TSREDCO issue Design, Supply, Installation, Testing and Commissioning of aggregated capacity of 1140KW (485KW + 355KW + 300KW) Grid Connected Rooftop Solar PV power plants at various Govt. Buildings in all over Telangana State. – EQ Mag Pro

NTPC Limited Issue Tender for Supply of 250 KWp Grid Tied Solar PV Rooftop System at SSTPS – EQ Mag

NTPC Limited Issue Tender for Supply of 250 KWp Grid Tied Solar PV Rooftop System at SSTPS. For more information please see below link:

TSREDCO issue Design, Supply, Installation, Testing and Commissioning of aggregated capacity of 1140KW (485KW + 355KW + 300KW) Grid Connected Rooftop Solar PV power plants at various Govt. Buildings in all over Telangana State. – EQ Mag Pro

NTPC Limited Issue Tender for Supply of 173.6 KW Roof Top Solar at NTPC Sipat – EQ Mag

NTPC Limited Issue Tender for Supply of 173.6 KW Roof Top Solar at NTPC Sipat. For more information please see below link:

TSREDCO issue Design, Supply, Installation, Testing and Commissioning of aggregated capacity of 1140KW (485KW + 355KW + 300KW) Grid Connected Rooftop Solar PV power plants at various Govt. Buildings in all over Telangana State. – EQ Mag Pro

NTPC Limited Issue Tender for Power Evacuation Package-II under Development of 755MW GVREL Solar Park at Tilaiya and Panchet Reservoir, DVC – EQ Mag

NTPC Limited Issue Tender for Power Evacuation Package-II under Development of 755MW GVREL Solar Park at Tilaiya and Panchet Reservoir, DVC. For more information please see below link:

TSREDCO issue Design, Supply, Installation, Testing and Commissioning of aggregated capacity of 1140KW (485KW + 355KW + 300KW) Grid Connected Rooftop Solar PV power plants at various Govt. Buildings in all over Telangana State. – EQ Mag Pro

Petition for reimbursement of Ash Transportation charges in Simhadri Super Thermal Power Station, Stage-II (2x500MW) in terms of Ministry of Environment and Forest – EQ Mag

Petition for reimbursement of Ash Transportation charges in Simhadri Super Thermal Power Station, Stage-II (2x500MW) in terms of Ministry of Environment and Forest. For more information please see below link:

Petition seeking appropriate action by the Commission under Sections 142 and 146 read with Section 149 of the Electricity Act, 2003 for non-compliance of Ombudsman’s Order and violation of the Regulation – EQ Mag Pro

NTPC Limited and GE Power India Limited sign MoU to reduce carbon intensity from NTPC’s coal fired units – EQ Mag

NTPC and GE Power India Limited and will partner to reduce carbon intensity at NTPC’s coal fired units. This is a first of a kind step for coal fleet decarbonization in the country. This partnership aims to demonstrate technologies for firing higher percentage of Torrefied Biomass in NTPC’s coal fired unit, Methanol Firing & Ammonia […]

Solis Seminar【Episode 51】: Pay attention to these common O&M problems with inverters in the winter time

NTPC Limited Issue Tender for Supply of POWER TRANSFORMER SUPPLY PACKAGE-II (SOUTH BLOCK) UNDER DEVELOPMENT OF 4750 MW SOLAR PARK AT KHAVDA, GUJARAT – EQ Mag

NTPC Limited Issue Tender for Supply of POWER TRANSFORMER SUPPLY PACKAGE-II (SOUTH BLOCK) UNDER DEVELOPMENT OF 4750 MW SOLAR PARK AT KHAVDA, GUJARAT. For more information please see below link:

TSREDCO issue Design, Supply, Installation, Testing and Commissioning of aggregated capacity of 1140KW (485KW + 355KW + 300KW) Grid Connected Rooftop Solar PV power plants at various Govt. Buildings in all over Telangana State. – EQ Mag Pro

NTPC Limited Issue Tender for Supply of cumulative capacity of 720 KWp grid connected Rooftop Solar Photovoltaic system at St-2 NTPC Barauni – EQ Mag

NTPC Limited Issue Tender for Supply of cumulative capacity of 720 KWp grid connected Rooftop Solar Photovoltaic system at St-2 NTPC Barauni. For more information please see below link:

TSREDCO issue Design, Supply, Installation, Testing and Commissioning of aggregated capacity of 1140KW (485KW + 355KW + 300KW) Grid Connected Rooftop Solar PV power plants at various Govt. Buildings in all over Telangana State. – EQ Mag Pro