tender – The Leading Solar Magazine In India https://www.eqmagpro.com Tue, 21 Feb 2023 11:38:03 +0000 en-US hourly 1 https://wordpress.org/?v=6.0 https://www.eqmagpro.com/wp-content/uploads/2019/05/cropped-eq-logo-32x32.png tender – The Leading Solar Magazine In India https://www.eqmagpro.com 32 32 CREST Issue Tender for Supply of 4 MW Canal Top SPV Power Plant High Power Evacuation on HT Side at Patiala Ki Rao behind Botanical Garden Sarangpur Chandigarh – EQ Mag https://www.eqmagpro.com/crest-issue-tender-for-supply-of-4-mw-canal-top-spv-power-plant-high-power-evacuation-on-ht-side-at-patiala-ki-rao-behind-botanical-garden-sarangpur-chandigarh-eq-mag/?utm_source=rss&utm_medium=rss&utm_campaign=crest-issue-tender-for-supply-of-4-mw-canal-top-spv-power-plant-high-power-evacuation-on-ht-side-at-patiala-ki-rao-behind-botanical-garden-sarangpur-chandigarh-eq-mag Tue, 21 Feb 2023 11:38:03 +0000 https://www.eqmagpro.com/?p=305810 CREST Issue Tender for Supply of 4 MW Canal Top SPV Power Plant High Power Evacuation on HT Side at Patiala Ki Rao behind Botanical Garden Sarangpur Chandigarh.

For more information please see below link:

]]>
MSEDCL Issue Tender for Supply of 250 MW (AC) SOLAR POWER FROM DECENTRALISED SOLAR PROJECTS OF MINIMUM 0.5 MW TO MAXIMUM 2 MW CAPACITY UNDER COMPONENT-A OF PM KUSUM SCHEME – EQ Mag https://www.eqmagpro.com/msedcl-issue-tender-for-supply-of-250-mw-ac-solar-power-from-decentralised-solar-projects-of-minimum-0-5-mw-to-maximum-2-mw-capacity-under-component-a-of-pm-kusum-scheme-eq-mag/?utm_source=rss&utm_medium=rss&utm_campaign=msedcl-issue-tender-for-supply-of-250-mw-ac-solar-power-from-decentralised-solar-projects-of-minimum-0-5-mw-to-maximum-2-mw-capacity-under-component-a-of-pm-kusum-scheme-eq-mag Tue, 21 Feb 2023 10:37:25 +0000 https://www.eqmagpro.com/?p=305806 MSEDCL Issue Tender for Supply of 250 MW (AC) SOLAR POWER FROM DECENTRALISED SOLAR PROJECTS OF MINIMUM 0.5 MW TO MAXIMUM 2 MW CAPACITY UNDER COMPONENT-A OF PM KUSUM SCHEME.

For more information please see below link:

]]>
ANERT Issue Tender for Supply of Grid connected SPV Power Plants at University of Kerala campus, Palayam, Thiruvananthapuram under Solar City Project – EQ Mag https://www.eqmagpro.com/anert-issue-tender-for-supply-of-grid-connected-spv-power-plants-at-university-of-kerala-campus-palayam-thiruvananthapuram-under-solar-city-project-eq-mag/?utm_source=rss&utm_medium=rss&utm_campaign=anert-issue-tender-for-supply-of-grid-connected-spv-power-plants-at-university-of-kerala-campus-palayam-thiruvananthapuram-under-solar-city-project-eq-mag Tue, 21 Feb 2023 10:26:40 +0000 https://www.eqmagpro.com/?p=305795 ANERT Issue Tender for Supply of Grid connected SPV Power Plants at University of Kerala campus, Palayam, Thiruvananthapuram under Solar City Project.

For more information please see below link:

]]>
Assam Rifles – MHA Issue Tender for Supply of 200 KW Solar Power Plants installed at Keithelmanbi – EQ Mag https://www.eqmagpro.com/assam-rifles-mha-issue-tender-for-supply-of-200-kw-solar-power-plants-installed-at-keithelmanbi-eq-mag/?utm_source=rss&utm_medium=rss&utm_campaign=assam-rifles-mha-issue-tender-for-supply-of-200-kw-solar-power-plants-installed-at-keithelmanbi-eq-mag Tue, 21 Feb 2023 10:22:55 +0000 https://www.eqmagpro.com/?p=305792 Assam Rifles – MHA Issue Tender for Supply of 200 KW Solar Power Plants installed at Keithelmanbi.

For more information please see below link:

]]>
Coal India Limited Issue Tender for Supply of 20 MW AC Solar PV Power Plant – EQ Mag https://www.eqmagpro.com/coal-india-limited-issue-tender-for-supply-of-20-mw-ac-solar-pv-power-plant-eq-mag/?utm_source=rss&utm_medium=rss&utm_campaign=coal-india-limited-issue-tender-for-supply-of-20-mw-ac-solar-pv-power-plant-eq-mag Tue, 21 Feb 2023 10:19:30 +0000 https://www.eqmagpro.com/?p=305788 Coal India Limited Issue Tender for Supply of 20 MW AC Solar PV Power Plant.

For more information please see below link:

 

]]>
SECI Issue RfS for Setting up of 1.2 GW ISTS-Connected Wind Power projects in India (Tranche-XIV) – EQ Mag https://www.eqmagpro.com/seci-issue-rfs-for-setting-up-of-1-2-gw-ists-connected-wind-power-projects-in-india-tranche-xiv-eq-mag/?utm_source=rss&utm_medium=rss&utm_campaign=seci-issue-rfs-for-setting-up-of-1-2-gw-ists-connected-wind-power-projects-in-india-tranche-xiv-eq-mag Tue, 21 Feb 2023 04:34:22 +0000 https://www.eqmagpro.com/?p=305729 RfS for 1.2 GW ISTS-conencted Wind Power Projects in India (Tranche-XIV) under Tariff-based competitive bidding has been issued under the Standard Bidding Guidelines.

The detailed RfS document has been uploaded on https://www.bharat-electronictender.com (Only viewed on Microsoft Internet explorer 10.x or above browser) and under “Tenders” Section on SECI’s Website www.seci.co.in. Prospective bidders are requested to refer to ISN-ETS and SECI websites for details.

Date of pre-bid meeting (to be conducted online): 27th February, 2023 (02:30 PM IST)

Last date of bid submission: 3rd April, 2023 (6:00 PM IST).

Prospective bidders are requested to remain updated for any notices/ amendments/ clarifications etc. to the RfS documents through the websites www.seci.co.in and https://www.bharat-electronictender.com as no separate notification will be issued.

Tender Search Code (TSC) for the RfS in ISN-ETS : SECI-2023-TN000003

For more information please see below link:

]]>
TSREDCO Issue Tender for Supply of 1.14 MW SPV Power Plants at various Govt. Buildings in all over Telangana State under RESCO Mode – EQ Mag https://www.eqmagpro.com/tsredco-issue-tender-for-supply-of-1-14-mw-spv-power-plants-at-various-govt-buildings-in-all-over-telangana-state-under-resco-mode-eq-mag/?utm_source=rss&utm_medium=rss&utm_campaign=tsredco-issue-tender-for-supply-of-1-14-mw-spv-power-plants-at-various-govt-buildings-in-all-over-telangana-state-under-resco-mode-eq-mag Mon, 20 Feb 2023 12:01:14 +0000 https://www.eqmagpro.com/?p=305721 TSREDCO Issue Tender for Supply of 1.14 MW SPV Power Plants at various Govt. Buildings in all over Telangana State under RESCO Mode.

For more information please see below link:

]]>
UK’s T-1 Capacity Auction awards 627 MW of battery storage – EQ Mag https://www.eqmagpro.com/uks-t-1-capacity-auction-awards-627-mw-of-battery-storage-eq-mag/?utm_source=rss&utm_medium=rss&utm_campaign=uks-t-1-capacity-auction-awards-627-mw-of-battery-storage-eq-mag Mon, 20 Feb 2023 11:51:09 +0000 https://www.eqmagpro.com/?p=305716 Battery energy storage projects totalling 627.4 MW have secured contracts in the UK’s 2023-24 Capacity Market auction, representing an increase of more than 60% compared to the previous round, the National Grid Electricity System Operator (NGESO) announced last week. The T-1 Auction was concluded on February 14 with the goal to ensure that the country has sufficient electricity capacity for the target period.
A total of 5,782 MW were procured from a target of 5,800 MW, including 2,620 MW from gas-fired power plants, 1,412 MW from nuclear facilities and 413 MW from lignite stations. Onshore and offshore wind together secured 65 MW. The projects were cleared at a price of GBP 60 (USD 72.25/EUR 67.56) per kW a year, lower than in the T-1 capacity auction held in 2022 when the price cap reached GBP 75/kW a year. For battery energy storage schemes, the allocated capacity represents an increase from 385 MW of awards in the previous round.
Overall, the technology accounted for 10.9% of the total awarded capacity, with 74 battery storage cell management units (CMUs) receiving contracts. According to provisional auction results released by NGESO, almost half of the winning battery projects propose one-hour duration systems, while about 40% are for two-hour facilities. The list of winning schemes includes Zenobe, Gresham House, Harmony Energy, Pivot Power and SUSI Storage, among others.
(GBP 1.0 = USD 1.204/EUR 1.126)
Source: renewablesnow
]]>
Ministry of Railways Issue Tender for Supply of 500 KWp On grid solar power plant at Station/Service buildings at different locations over Ambala Division – EQ Mag https://www.eqmagpro.com/ministry-of-railways-issue-tender-for-supply-of-500-kwp-on-grid-solar-power-plant-at-station-service-buildings-at-different-locations-over-ambala-division-eq-mag/?utm_source=rss&utm_medium=rss&utm_campaign=ministry-of-railways-issue-tender-for-supply-of-500-kwp-on-grid-solar-power-plant-at-station-service-buildings-at-different-locations-over-ambala-division-eq-mag Mon, 20 Feb 2023 04:44:09 +0000 https://www.eqmagpro.com/?p=305659 Ministry of Railways Issue Tender for Supply of 500 KWp On grid solar power plant at Station/Service buildings at different locations over Ambala Division.

For more information please see below link:

]]>
Damodar Valley Corporation Issue Tender for O and M of 8 MW (AC) Ground Mounted Solar PV Power Plants at Panchet, Dist.-Dhanbad in the state of Jharkhand – EQ Mag https://www.eqmagpro.com/damodar-valley-corporation-issue-tender-for-o-and-m-of-8-mw-ac-ground-mounted-solar-pv-power-plants-at-panchet-dist-dhanbad-in-the-state-of-jharkhand-eq-mag/?utm_source=rss&utm_medium=rss&utm_campaign=damodar-valley-corporation-issue-tender-for-o-and-m-of-8-mw-ac-ground-mounted-solar-pv-power-plants-at-panchet-dist-dhanbad-in-the-state-of-jharkhand-eq-mag Mon, 20 Feb 2023 04:38:40 +0000 https://www.eqmagpro.com/?p=305654 Damodar Valley Corporation Issue Tender for O and M of 8 MW (AC) Ground Mounted Solar PV Power Plants at Panchet, Dist.-Dhanbad in the state of Jharkhand.

For more information please see below link:

]]>
Ministry of Railways Issue Tender for Supply of 400 KW on grid Solar Power plant at RSW Dahod – EQ Mag https://www.eqmagpro.com/ministry-of-railways-issue-tender-for-supply-of-400-kw-on-grid-solar-power-plant-at-rsw-dahod-eq-mag/?utm_source=rss&utm_medium=rss&utm_campaign=ministry-of-railways-issue-tender-for-supply-of-400-kw-on-grid-solar-power-plant-at-rsw-dahod-eq-mag Sat, 18 Feb 2023 11:28:11 +0000 https://www.eqmagpro.com/?p=305651 Ministry of Railways Issue Tender for Supply of 400 KW on grid Solar Power plant at RSW Dahod.

For more information please see below link:

]]>
MSEDCL Issue Tender for Supply of 1 GW (AC) SOLAR POWER FROM PROJECTS TO BE DEVELOPED IN Maharashtra THROUGH COMPETITIVE BIDDING PROCESS – EQ Mag https://www.eqmagpro.com/msedcl-issue-tender-for-supply-of-1-gw-ac-solar-power-from-projects-to-be-developed-in-maharashtra-through-competitive-bidding-process-eq-mag/?utm_source=rss&utm_medium=rss&utm_campaign=msedcl-issue-tender-for-supply-of-1-gw-ac-solar-power-from-projects-to-be-developed-in-maharashtra-through-competitive-bidding-process-eq-mag Fri, 17 Feb 2023 10:59:49 +0000 https://www.eqmagpro.com/?p=305523 MSEDCL Issue Tender for Supply of 1 GW (AC) SOLAR POWER FROM PROJECTS TO BE DEVELOPED IN Maharashtra THROUGH COMPETITIVE BIDDING PROCESS.

For more information please see below link:

]]>
APDCL Issue Tender for Supply of 70 MWAC Solar power from Grid Connected Ground Mounted Solar PV Project to be developed in Bilasipara, in Dhubri District of Assam – EQ Mag https://www.eqmagpro.com/apdcl-issue-tender-for-supply-of-70-mwac-solar-power-from-grid-connected-ground-mounted-solar-pv-project-to-be-developed-in-bilasipara-in-dhubri-district-of-assam-eq-mag/?utm_source=rss&utm_medium=rss&utm_campaign=apdcl-issue-tender-for-supply-of-70-mwac-solar-power-from-grid-connected-ground-mounted-solar-pv-project-to-be-developed-in-bilasipara-in-dhubri-district-of-assam-eq-mag Fri, 17 Feb 2023 10:45:34 +0000 https://www.eqmagpro.com/?p=305512 APDCL Issue Tender for Supply of 70 MWAC Solar power from Grid Connected Ground Mounted Solar PV Project to be developed in Bilasipara, in Dhubri District of Assam.

For more information please see below link:

]]>
SECI Issue Tender for O&M of 2MW (AC) Solar PV Power Plant with 01 MW BESS at KAZA, Himachal Pradesh – EQ Mag https://www.eqmagpro.com/seci-issue-tender-for-om-of-2mw-ac-solar-pv-power-plant-with-01-mw-bess-at-kaza-himachal-pradesh-eq-mag/?utm_source=rss&utm_medium=rss&utm_campaign=seci-issue-tender-for-om-of-2mw-ac-solar-pv-power-plant-with-01-mw-bess-at-kaza-himachal-pradesh-eq-mag Fri, 17 Feb 2023 04:39:08 +0000 https://www.eqmagpro.com/?p=305445 Employer: Solar Energy Corporation of India Limited (SECI), New Delhi, India

Owner: Himachal Renewable Limited

Contract title: Tender for Design, Engineering, Supply, Construction, Erection, Testing, Commissioning including 5 Years Plant O&M of 2MW (AC) Solar PV Power Plant with 01 MW BESS at KAZA, Himachal Pradesh.

Tender No: SECI/C&P/MI/00/0011/2022-23

The Bidding documents in English (Tender No. SECI/C&P/MI/00/0011/2022-23 dated 17.02.2023) for setting up of 2MW (AC) Solar PV Power Plant with 01 MW BESS at KAZA, Himachal Pradesh have been uploaded & is available online on https://www.bharat-electronictender.com (Only viewed on Microsoft Internet explorer 10.x or above browser) & is also attached with this notification of SECI’s website.

Bidding document available at SECI’s website is for reference purpose only & the official copy of the documents for participation purpose is available at Electronic Tender India website at https://www.bharat-electronictender.com . Interested bidders have to download the official copy of bidding documents after logging into the Electronic Tender India (ETI) website by using the Login ID and Password provided by ETI during registration.

The bidder shall only be eligible to submit/ upload the Response to the tender after logging into the ETI portal and downloading the official copy.

Date of Pre-Bid meeting: Seprate notification will be issued regarding the same.

Last Date for online submission of Bids: 03/04/2023 till 1400 Hours

Opening of Techno-Commercial Bids: 03/04/2023 at 1600 Hours

Prospective Bidders are requested to remain updated for any notices wrt the Bidding document through the websites www.seci.co.in and https://www.bharat-electronictender.com as no separate notification will be issued in this regard.

For more information please see below link:

]]>
MSEDCL Issue REQUEST FOR SELECTION (RfS) FOR PROCUREMENT OF 200 MW WIND POWER ON LONG TERM BASIS THROUGH COMPETITIVE BIDDING PROCESS – EQ Mag https://www.eqmagpro.com/msedcl-issue-request-for-selection-rfs-for-procurement-of-200-mw-wind-power-on-long-term-basis-through-competitive-bidding-process-eq-mag/?utm_source=rss&utm_medium=rss&utm_campaign=msedcl-issue-request-for-selection-rfs-for-procurement-of-200-mw-wind-power-on-long-term-basis-through-competitive-bidding-process-eq-mag Thu, 16 Feb 2023 11:22:22 +0000 https://www.eqmagpro.com/?p=305436 MSEDCL Issue REQUEST FOR SELECTION (RfS) FOR PROCUREMENT OF 200 MW WIND POWER ON LONG TERM BASIS THROUGH COMPETITIVE BIDDING PROCESS.

For more information please see below link:

]]>
CPWD Issue Tender for Supply of 250 KW online grid interactive roof top solar photovoltaic power plant – EQ Mag https://www.eqmagpro.com/cpwd-issue-tender-for-supply-of-250-kw-online-grid-interactive-roof-top-solar-photovoltaic-power-plant-eq-mag/?utm_source=rss&utm_medium=rss&utm_campaign=cpwd-issue-tender-for-supply-of-250-kw-online-grid-interactive-roof-top-solar-photovoltaic-power-plant-eq-mag Thu, 16 Feb 2023 11:10:28 +0000 https://www.eqmagpro.com/?p=305434

Enquiry Particulars

Tender ID 34102 NIT/RFP NO 03/NIT/SE/EE/IIIT/Kalyani/CPWD/2022-23
Name of Work Construction of New campus for IIIT Kalyani. SH: SITC of 250 KWp online grid interactive roof top solar photovoltaic power plant, Solar hot water system & R.O plant. Subwork/Packages
Tender Type OPEN Procurement Type WORKS
Bid Type Percentage Estimated Cost(INR)
₹ 2,25,89,284

( Two Crore Twenty Five Lakh Eighty Nine Thousand Two Hundred and Eighty Four Rupees )

Time Allowed 5 months Type of Work Solar Power plants-Goods
Category of Tendered ELECTRICAL

Tender Dates

Tender Publishing Date & Time 16/02/2023 13:41 Last Date & Time of receipt of Pre-Bid Queries 20/02/2023 11:00
Receipt of Queries through Email Email kolee-iiitk@cpwd.gov.in
Pre Bid Meeting Opening Date & Time 20/02/2023 11:30 Pre Bid Meeting Venue IIIT Kalyani site office.
Bid Submission Closing Date & Time 23/02/2023 15:00 Bid Validity Period (in Days) 75
Bid Validity Expiry Date 09/05/2023 15:30 After Technical cum Eligibility Bid Opening Tender Notice Type Standard Notice Tender

Tender Inviting Authority Particulars

Office Inviting Bids EE&SM( C) -1 Designation TAPAS KUMAR PAUL
Address CPWD, IIIT Kalyani Contact Details 7077704818
Email ee.cpwd.iiitk@gmail.com

EMD (INR)

EMD (INR) ₹ 4,51,786 EMD In Favour Of Project Region Kolkata – SE cum PD-IIIT, Kalyani – EE&SM( C) -1
Mode of Payment DD,FDR,BG
]]>
BHEL Issue Tender for Maintenance activity at 5 MW solar power plant of HEEP Plant – EQ Mag https://www.eqmagpro.com/bhel-issue-tender-for-maintenance-activity-at-5-mw-solar-power-plant-of-heep-plant-eq-mag/?utm_source=rss&utm_medium=rss&utm_campaign=bhel-issue-tender-for-maintenance-activity-at-5-mw-solar-power-plant-of-heep-plant-eq-mag Thu, 16 Feb 2023 11:07:12 +0000 https://www.eqmagpro.com/?p=305431 BHEL Issue Tender for Maintenance activity at 5 MW solar power plant of HEEP Plant.

For more information please see below link:

]]>
Brazil’s Copel invites proposals for biomass, bio-waste hydrogen R&D – EQ Mag https://www.eqmagpro.com/brazils-copel-invites-proposals-for-biomass-bio-waste-hydrogen-rd-eq-mag/?utm_source=rss&utm_medium=rss&utm_campaign=brazils-copel-invites-proposals-for-biomass-bio-waste-hydrogen-rd-eq-mag Thu, 16 Feb 2023 10:11:52 +0000 https://www.eqmagpro.com/?p=305420 Brazilian power utility Companhia Paranaense de Energia (BVMF:CPLE6), better known as Copel, has launched a call to sponsor research and development (R&D) projects on new technologies for the production and handling of low-carbon hydrogen obtained from biomass, biogas and other organic waste streams. Selected projects will be granted up to BRL 7.6 million (USD 1.46m/EUR 1.37m), the company said.

Do you know we have a daily hydrogen newsletter? Subscribe here for free! The proposals must explore at least one of the following four themes: development of methodology for low-carbon hydrogen production, innovative solutions for the logistics and hydrogen distribution, hydrogen storage solutions and the search for solutions for new applications and uses of low-carbon hydrogen. Deadline to submit proposals is set for February 28. Copel said that it is interested in low-carbon renewable hydrogen and wants to “dominate this technology”. According to the company, costs of biogas reforming are lower compared to electrolysis and the process offers greater efficiency. Copel also highlighted the agricultural potential of its home state of Parana as the reason for exploring hydrogen production from biomass and biogas.
Source: renewablesnow
]]>
Two Texas hydrogen hub proposals unite in pursuit of federal funds – EQ Mag https://www.eqmagpro.com/two-texas-hydrogen-hub-proposals-unite-in-pursuit-of-federal-funds-eq-mag/?utm_source=rss&utm_medium=rss&utm_campaign=two-texas-hydrogen-hub-proposals-unite-in-pursuit-of-federal-funds-eq-mag Thu, 16 Feb 2023 10:09:30 +0000 https://www.eqmagpro.com/?p=305417 Two proposals for regional clean hydrogen hubs in the US, the Port of Corpus Christi Horizons Clean Hydrogen Hub (HCH2) and Trans Permian H2Hub, have decided to join forces and proceed by submitting a single application in the US Department of Energy’s (DoE) Regional Clean Hydrogen Hubs Programme.

The US has committed USD 8 billion (EUR 7.4bn) to the establishment of clean hydrogen hubs around the country. The DoE opened a USD-7-billion funding opportunity in September 2022 with the intention to back up to 10 hubs.

After concept paper submissions in November 2022, HCH2 and Trans Permian have been both encouraged by the DoE to file full applications, which are due in April 2023. The merger of the two proposals was announced by the Port of Corpus Christi on Tuesday. The leading US energy export port, located on the western Gulf of Mexico, will be the prime applicant.

The HCH2 proposal includes about two dozen clean hydrogen production projects and about 30 private sector team members. The Trans Permian hub, put forward by MMEX Resources Corp, includes the Texas Permian Basin cities of San Antonio, San Angelo, Big Spring, Midland, Odessa, El Paso, Fort Stockton, Alpine, Presidio and Del Rio. It encompasses production and hydrogen derivatives from various feedstocks as well as mobility projects.

“West Texas has anchored domestic energy production for decades, with a physical and commercial connection to the Gulf Coast that is the backbone of the nation’s energy economy,” said Jeff Pollack, chief strategy and sustainability officer for the Port of Corpus Christi. “Our integrated Hub concept creates the roadmap for diversifying and decarbonising this historic corridor with the potential to deliver transformative benefits to communities in the Hub,” Pollack added.

(USD 1 = EUR 0.929)

Source:  renewablesnow
]]>
Brazil okays 457.5 MW of renewable projects from Oct 14 tender – EQ Mag https://www.eqmagpro.com/brazil-okays-457-5-mw-of-renewable-projects-from-oct-14-tender-eq-mag/?utm_source=rss&utm_medium=rss&utm_campaign=brazil-okays-457-5-mw-of-renewable-projects-from-oct-14-tender-eq-mag Thu, 16 Feb 2023 10:07:13 +0000 https://www.eqmagpro.com/?p=305415 Brazil’s power sector regulator Aneel approved on Tuesday 457.5 MW of winning renewable energy projects from the A-5 tender held on October 14, 2022.

The approvals were granted to 20 of the 22 winning proposals for wind, solar, hydro, biomass-based power and one waste-to-energy plant. A-5 finished with around 557.5 MW of capacity, with solar accounting for most of the capacity — 200 MW across four projects. The awarded schemes represent future investments of some BRL 3 billion (USD 581m/EUR 540m).

As Aneel previously said, power purchase agreements (PPAs) for wind and solar in this tender will have a term of 15 years. Projects for other sources can count on 20 years.
Power supply is set to start on January 1, 2027.

(BRL 1.0 = USD 0.194/EUR 0.180)

Source: renewablesnow
]]>
PPC Renewables buys 46-MW wind-solar portfolio in Greece – EQ Mag https://www.eqmagpro.com/ppc-renewables-buys-46-mw-wind-solar-portfolio-in-greece-eq-mag/?utm_source=rss&utm_medium=rss&utm_campaign=ppc-renewables-buys-46-mw-wind-solar-portfolio-in-greece-eq-mag Thu, 16 Feb 2023 10:04:24 +0000 https://www.eqmagpro.com/?p=305413 PPC Renewables, part of Greek power utility PPC SA (ATH:PPC), has finalised the acquisition of a 46-MW portfolio of wind and solar photovoltaic (PV) parks in its home country from Piraeus Equity Partners.

The acquired portfolio consists of 44 MW of onshore wind farms in the Lakonia prefecture of southern Greece and 2 MW of solar plants in Thessaly region, PPC said on Wednesday. The value of the purchase was kept under wraps. The assets were bought by PPC Renewables after the company won a competitive tender process held by the Cyprus-based unit of Greece’s Piraeus Bank Group. A share purchase agreement was signed in December last year.

Under its 2022-2026 business plan, PPC aims to grow its installed renewables fleet to 7.2 GW by 2024 and 9.5 GW by 2026 and move away from coal. Last month, the utility’s renewables unit secured funding from the European Investment Bank (EIB) for three solar projects totalling 230 MWp in Western Macedonia and joined hands with Germany’s RWE AG to build 210 MWp of PV parks at the site of a former open-pit lignite mine in the same region.

Source: renewablesnow
]]>
Siemens Gamesa plans NY nacelle factory if it bags offshore wind orders – EQ Mag https://www.eqmagpro.com/siemens-gamesa-plans-ny-nacelle-factory-if-it-bags-offshore-wind-orders-eq-mag/?utm_source=rss&utm_medium=rss&utm_campaign=siemens-gamesa-plans-ny-nacelle-factory-if-it-bags-offshore-wind-orders-eq-mag Thu, 16 Feb 2023 04:50:45 +0000 https://www.eqmagpro.com/?p=305187 Siemens Gamesa plans NY nacelle factory if it bags offshore wind orders.

Wind turbine maker Siemens Gamesa said on Monday it would build a factory for offshore nacelles in the state of New York, provided that its machines are selected in the state’s third offshore wind solicitation.

The facility would be located at the Port of Coeymans, where Siemens Gamesa’s peer GE Renewable Energy also plans to build factories to manufacture offshore wind turbine components and pick up orders stemming from the wind tender.

Siemens Gamesa said its nacelle factory would represent an investment of around USD 500 million (EUR 466.6m), and could create some 420 direct jobs. The turbine company also plans to set up a local supplier network to secure steel components, bearings and composite components, it said.

The factory and the suppliers would serve all Siemens Gamesa offshore wind projects along the US East Coast.

The New York state authorities launched the third solicitation round last July targeting at least 2,000 MW of offshore wind power.

(USD 1.0 = EUR 0.933)

Source: renewablesnow
]]>
Vermont joins Northeast Clean Hydrogen Hub bid – EQ Mag https://www.eqmagpro.com/vermont-joins-northeast-clean-hydrogen-hub-bid-eq-mag/?utm_source=rss&utm_medium=rss&utm_campaign=vermont-joins-northeast-clean-hydrogen-hub-bid-eq-mag Thu, 16 Feb 2023 04:41:01 +0000 https://www.eqmagpro.com/?p=305189 New York governor Kathy Hochul last week announced that Vermont has joined six other states in a bid to compete for federal funding to establish the Northeast Clean Hydrogen Hub.

Under an USD-8-billion (EUR 7.5bn) hydrogen hub programme funded through the Bipartisan Infrastructure Law, the US is looking to set up to 10 regional clean hydrogen hubs.

The Northeast Clean Hydrogen Hub that now includes the states of New York, Connecticut, Maine, Massachusetts, New Jersey, Rhode Island and Vermont, as well as more than 100 clean hydrogen ecosystem partners, is progressing to develop and submit a full proposal to the US Department of Energy (DoE) for the hydrogen hub funding. The department issued an initial Clean Hydrogen Hubs Funding Opportunity Announcement in September 2022. Concept papers were due in November. The Northeast Regional Clean Hydrogen Hub received a determination that it should move forward with a full proposal on December 27, with the deadline for submissions being April 7, 2023. Projects may receive up to USD 1.25 billion.

Since an update in August, the New York-led coalition has added a number of partners from the industry, academia and non-profit sectors, including names such as AES, Atlantic Shores Offshore Wind, Mitsubishi Power Americas Inc and NextEra Energy Resources.

The partners will continue to focus on the integration of renewables, such as onshore and offshore wind, hydropower and solar, and of nuclear power into clean hydrogen production, and the assessment of clean hydrogen for use in transportation, heavy industry and power generation.

(USD 1 = EUR 0.935)

Source: renewablesnow
]]>
Chennai Port Trust Issue Tender for Supply of 500 KW ROOF TOP GRID CONNECTED SOLAR PHOTO VOLTAIC SYSTEM FOR 5 YEARS AT VARIOUS LOCATIONS IN CHENNAI – EQ Mag https://www.eqmagpro.com/chennai-port-trust-issue-tender-for-supply-of-500-kw-roof-top-grid-connected-solar-photo-voltaic-system-for-5-years-at-various-locations-in-chennai-eq-mag/?utm_source=rss&utm_medium=rss&utm_campaign=chennai-port-trust-issue-tender-for-supply-of-500-kw-roof-top-grid-connected-solar-photo-voltaic-system-for-5-years-at-various-locations-in-chennai-eq-mag Wed, 15 Feb 2023 11:55:16 +0000 https://www.eqmagpro.com/?p=305329 Chennai Port Trust Issue Tender for Supply of 500 KW ROOF TOP GRID CONNECTED SOLAR PHOTO VOLTAIC SYSTEM FOR 5 YEARS AT VARIOUS LOCATIONS IN CHENNAI.

For more information please see below link:

]]>
MSEDCL Issue Tender for Supply of 500 MW INTRA STATE GRID CONNECTED SOLAR PHOTOVOLTAIC POWER PROJECTS – EQ Mag https://www.eqmagpro.com/msedcl-issue-tender-for-supply-of-500-mw-intra-state-grid-connected-solar-photovoltaic-power-projects-eq-mag/?utm_source=rss&utm_medium=rss&utm_campaign=msedcl-issue-tender-for-supply-of-500-mw-intra-state-grid-connected-solar-photovoltaic-power-projects-eq-mag Wed, 15 Feb 2023 11:49:30 +0000 https://www.eqmagpro.com/?p=305323 MSEDCL Issue Tender for Supply of 500 MW INTRA STATE GRID CONNECTED SOLAR PHOTOVOLTAIC POWER PROJECTS.

For more information please see below link:

]]>